Signed contract for the manufacture and assembly of E 190/195 Wing Stud & Winglets
2006
Signed contract for the manufacture and assembly of Phenom 100 (Vertical & Horizontal Stabilizer) and Phenom 300 composite parts.
2008
Registry of the name “Alestis Aerospace, Ltd.”
May 2008
Signed contract with Belly Fairing A350 XWB
August 2008
Signed contract S19.1 A350 XWB
Febrery 2009
SK Group and Sacesa form part of Alestis, with a capital of 147 million Euros
July 2009
Qualification B787-8 HTP Forward Panels
2010
Fusion and birth of the Alestis Group (“Alestis Aerospace Manufacturing, S.L.U.” and “Alestis Aerospace Engineering, S.L.U”)
July 2010
Inauguration of the plant in Puerto Real
September 2010
Delivery of 1st Belly Fairing A350 XWB to client (MSN001)
September 2011
Qualification B787-9 HTP Tip & Strakelet
September 2012
Signed contract Legacy 450/500 sheet metal parts
2012
Delivery 1st tail cone A350 XWB to client (MSN001)
October 2012
Delivery of airplane 500 Wing Stub E190/195
October 2013
The Mercantile Courts ratify the approval of the Creditors Agreement for Alestis thus ending the state of insolvency.
February 2014
Entrance of Airbus in the capital and fusion of AAM and AAE → Alestis Aerospace
July 2014
SEPI joins in with capital and into the current configuration of the Board of Directors
January 2015
Delivery of 1st Belly Fairing A350 XWB V1000 (MSN059)
September 2015
Delivery Aircraft 200 MLGD A380
October 2015
Delivery of 1st Tail Cone A350 XWB V1000 (MSN 059)
Delivery of 1st set of ribs A330 Neo
Aircraft 500 HTP A320 Neo
February 2016
Delivery aircraft 100 B787-9 Tips & Strakelets
June 2016
Este sitio web utiliza cookies para mejorar su experiencia. Suponemos que esta usted de acuerdo con la Ley de Política de Cookies si continua navegando, por consiguiente consideramos que acepta su uso. Puede consultar las políticas pulsando Leer más.
Para cerrar este aviso pulse Aceptar.